LumenAudit Pro
Pre-design triage tool

Electrical Infrastructure Readiness Score

Score a facility's retrofit readiness across service size, panel capacity, long-lead electrical gear, controls, incentives, and commissioning.

No account required for this preliminary screen. Results are planning signals, not utility approval or engineering sign-off.

Facility score Awaiting inputs
-
Needs triage
Inputs
0/6
Priority
P3
Queue
Triage
Live readinessAwaiting inputs
-0/6 inputsTriageSelect next step
Input fields

Score the facility

Populate from field audit, one-line, utility coordination, or pre-design notes.

-score
-score

Approximate spare breaker space or kW margin.

-score

Based on current sourcing outlook.

-score

BAS access, lighting control zones, and intent.

-score

Use before relying on incentives in the proposal.

-score

Closeout and acceptance testing readiness.

Constraint profile
Recommended next steps
Choose a next step

This is a preliminary planning signal. It does not establish utility approval, engineering sign-off, verified rebate eligibility, or a final design.

Route the readiness signal

Tell us what this result is for.

To save, share, or turn this screen into a reviewed next step, provide an email and select the conversation you need.

Intended next step Required

Add at least one readiness input, then choose a next step.